Link

Social

Embed

Disable autoplay on embedded content?

Download

Download
Download Transcript

[I. Call to order]

[00:00:05]

. AT THIS TIME, I'D LIKE TO CALL TO ORDER THE ARCHITECTURE VIEW BOARD MEETING. FOR UH, 10. 2023 PLEASE HAVE A ROLL CALL. MR HENSON HERE, MR ARJUN, MR. BROWN HERE, MR. DAVEY MR MALLET. MS MOORE HERE COUNCIL MEMBER WILL TROUT HERE. WE HAVE FOUR VOTING MEMBERS PRESIDENT WE HAVE A QUORUM. THANK YOU. IS THERE ANY COMMENTS OR ACTIONS ON AMENDMENTS FOR OUR PREVIOUS JUNE

[III. Action on minutes: June 12, 2023]

12TH MEETING 2023. I HAD ONE SMALL COMMENT. I WAS NOT AT THE MEETING, BUT A OR B 57-2023 AT THE ROLL CALL. IT NOTES THAT MS BROWN APPROVED THINK THAT SHOULD BE IN THIS MORNING. GOOD CATCH.

I'LL MAKE THAT. CORRECT ME. THAT WAS IT. THAT BEING, UH. EDITED. COULD WE PLEASE HAVE A MOTION TO PROOF THE MINUTES I WOULD MOVE TO APPROVE? AND SECOND. THANK YOU. MR BROWN? YES MISS MORE.

YES, MR DAVEY? YES? MR HENSON? YES. I HAVE FOUR VOTES IN FAVOR OF THE MINUTES AS CORRECTED.

[IV. Additions or corrections to agenda]

THANK YOU. UM ARE THERE ANY ADDITIONS OR CORRECTIONS TO THE AGENDA NOT FROM DOWN. THANK YOU SO MUCH. AT THIS TIME, I'D LIKE TO SWEAR ANYONE WOULD LIKE TO SPEAK BEFORE THE BOARD THIS EVENING. DO YOU SWEAR TO TELL THE TRUTH AND NOTHING BUT THE TRUTH? THANK YOU. ON THAT MOVE

[V. Case]

FORWARD WITH UH, CASE. AIR B 57 2023. IT IS A PROCYON STUDIO CARE OF SEAN ALLEY FOR CERTIFICATE OF APPROPRIATENESS. MAY I HAVE SO YES. YES, THANK YOU. SO THIS IS A CERTIFICATE OF APPROPRIATENESS WITH WAIVERS TO ALLOW ME PROJECTING SIGN TO BE INSTALLED AT 108 NORTH HIGH STREET FROM VIVIAN NAIL HOUSE. THERE'S SOME ADDITIONAL WAIVERS THAT ARE BEING REQUESTED OF DESCRIBE AS WE GO THROUGHOUT THE PRESENTATION. SO JUST IN CASE ANYONE'S UNFAMILIAR WITH WHERE THIS IS LOCATED, I'VE OUTLINED THE PARCEL AND RED HERE. IT'S KIND OF LIKE, ORIENT YOU THE ORIGINAL NEW ALBANY HIGH SCHOOL BUILDING IS RIGHT HERE AND THIS PORTION OF THE SCREEN ALL ABOUT KIDS. THE NEW DAYCARES HERE. THIS IS MILLER AVENUE. AGAIN IF YOU'RE STILL DRAWING A BLANK WITH WHERE WE'RE TALKING ABOUT. HERE IS A STREET VIEW. THIS BUILDINGS A LITTLE KIND OF TUCKED BACK THERE, SO IT'S SOMETIMES HARD TO SEE. ARE WE RECALL, SO THERE'S THE BUILDINGS HERE THE SIGN TO BE TALKING ABOUT YOU SEE IN THE NEXT IMAGE IS GOING TO BE LOOKING ON THIS SIDE OF THE BUILDING HERE, BASTING TOWARDS HIGH STREET. THERE'S AN EXISTING DROP POST SIGN ON THE PROPERTY THAT HAS THE NAME OF ONE BUSINESS AND HAS BEEN RE FACED TO ACCOMMODATE THE VIVIAN THE IN HOUSE. SORRY PORTION OF THE SIGN AS WELL. SO THIS IS THE SIGN ITSELF. IT'S A PROJECTING SIGN, AS YOU NOTED, IN YOUR STATUS AS YOU'LL SEE IN YOUR STAFF REPORT, THE APPLICANT IS MEETING ALL TYPICAL REQUIREMENTS FOR PROJECTING SIGN . AND THEN HE SAID HE COULD, WITH THE EXCEPTION OF THE THICKNESS, PROJECTING SIGNS HAVE TO HAVE A MINIMUM RELIEF OR THICKNESS OF ONE INCH. THERE IS A CONDITION OF APPROVAL ON THE STAFF REPORTS. UM THAT STAYS, THE SAME SHOULD BE AT LEAST ONE INCH THICK. THE APPLICANT HAS SINCE REVISED THE APPLICATION AFTER WE PUBLISHED THE STAFF REPORT TO MEET THAT CONDITION OF APPROVAL. SO THIS IS PRETTY INTERESTING SITUATION. NOW WE'RE ON THE WAIVERS PORTION OF THE APPLICATION. SO THE SITE IS OWNED. THIS IS THE ZONING OVERLAID ON THE AERIAL. THE SITE IS OWNED. IT'S AN URBAN CENTER CODE, AND IT'S WITHIN THE HISTORIC CENTER SUBDISTRICT, WHICH ALLOWS FOR COMMERCIAL AND RETAIL USES TO BE DEVELOPED ON THE PROPERTY OR BE LOCATED INSIDE THE EXISTING BUILDING.

YOU'LL SEE THIS BLUISH COLOR EVERY YEAR. THAT'S THE NEW ALBANY SCHOOL CAMPUS AND IT SOON CAMPUS AND THEN THE WINDSOR SUBDIVISION YOU'LL SEE HAS AN OVERLAY OF VILLAGE RESIDENTIAL.

SO WHILE I'M COMMERCIAL AND RETAIL TAPE USES ARE ALLOWED TO BE LOCATED INSIDE THIS BUILDING ON THIS PROPERTY THE NEXT IMAGE THAT I HAVE HERE IS THE VILLAGE CENTER SIGN CODE. SO IT DOES NOT ALLOW ANY COMMERCIAL TYPE SIGNAGE TO BE ON THE BUILDING AT ALL. IT IS LOCATED WITHIN THE

[00:05:06]

VILLAGE RESIDENTIAL SUB DISTRICT OF THE CITY SIGN CODE, SO THE ONLY THING THAT'S ALLOWED THERE IS A SUBDIVISION ENTRANCE SIGN. AND THIS IS CLEARLY NOT A SUBDIVISION, SO THE ADVOCATE NEEDS TO WAIVERS. ONE TO ALLOW, UM THE SECOND SIGN TO BE INSTALLED IN THE BUILDING, AND THEN ONE ANOTHER WAIVER TO ALLOW , UM PROJECTING SIDE TO BE INSTALLED ALTOGETHER. SO IN OUR . AND OUR STAFF REPORT. WE READ ABOUT THE WAIVER PRETTY POSITIVELY. WE THINK ALL THE APPLICANTS ASKING FOR WAIVERS. WE THINK IT MAKES SENSE. YOU KNOW, THE THERE'S ONLY OTHER PROPERTY ALLOWS RETAIL COMMERCIAL USES. IT MAKES SENSE WHEN WE WANT TO SEE, YOU KNOW, COMMERCIAL TYPE SIGNAGE BE INSTALLED IN THE BUILDING. IT'S MEETING ALL THE CONDITIONS OF APPROVAL AND THE REVISIONS FROM THE APPLICANTS MEETING ALL OF THE CITY SANCTIONED REQUIREMENTS FOR PROJECTING SIGN. WE'RE HAPPY TO ANSWER ANY QUESTIONS. THANK YOU VERY MUCH. IF I COULD CORRECT MY UH, EARLIER COMMENT. THIS IS FOR A OR B. 57 NOT 55. CORRECT. SORRY THIS IS ACTUALLY A RBI 55 55 THE ONE WE HEARD LAST MONTH. THERE WAS LITTLE BIT OF DELAY IN GETTING THE APPLICANT HERE TONIGHT. BUT THE ONE WE HAD LAST MONTH WAS 57. OKAY? SORRY. THERE WILL BE 55.

VIVIAN NAIL, NOT THANK YOU. HAVING STAFF DID A GOOD JOB JUSTIFYING THE YEAH, TO WAIVER REQUESTS. AND SHOWING IT. THEY DESERVE ACTUALLY. GOOD, GOOD CALL. FOR APPROVAL, AND I DO AGREE THAT THE RELIEF AT THE EDGE OF THE SCIENCE IS ALSO A GOOD CALL. HAVE A QUESTION? UM.

THE SHOP DRAWING SHOW JUST THE PROJECTING SIGN. BUT I BELIEVE YOU SAID THAT THE DOOR POST SIGN IS SECONDARY SIGN THAT WILL HAVE THE LOGO AND SIGNAGE ON IT AS WELL. CORRECT CORRECT. THERE'S A GO BACK TO THE IMAGE HERE. SO YEAH, THAT'S EXISTING SIGN. THE BOTTOM PORTION OF IT HAS BEEN RE FACED TO ALLOW OUR TO CONTAIN INFORMATION ABOUT THE BUSINESS. THAT TYPE OF APPLICATION DOES NOT GET REPUTED APPROVED BY THE AIR B. SINCE IT'S JUST A SIGN RE FACE. THERE OUGHT TO DO THAT TYPE OF MAINTENANCE AND AMAZING. THANK YOU. PLEASE COME TO THE MICROPHONE. INTRODUCE YOURSELF.

HI. I'M SEEING A CHARDONNAY OWNERS SIGN GLOW. NICE OF YOU TO ALL COME OUT AND MEET ME. NICE TO MEET YOU. UM. EVEN THOUGH THERE IS A GROUND SIGN THERE. I KNOW THAT WHEN I WAS LOOKING FOR THAT PLACE RIGHT BY RIGHT BY AND I DON'T FEEL THAT SHE WILL BE SUCCESSFUL AT ALL. IF SHE JUST HAS A LITTLE NAME ON THERE, AND THIS PROJECTING SIGN RIGHT THERE. WILL ATTRACT YOU KNOW THE TRAFFIC GOING EITHER WAY, OF COURSE. AND I THINK IT WOULD BE, YOU KNOW A BIG HELP TO HER. I AGREE. YES. I THINK THE FACT THAT THERE'S ONLY TWO PROPERTIES THAT ARE KIND OF FALL INTO THIS SORT OF TRAP IS ALSO MORE JUSTIFICATION FOR NOT SETTING UP A PRECEDENT. CONCERN. I AGREE.

ANYONE ELSE ON THE BOARD HAVE ANY COMMENTS? MID. STRAIGHTFORWARD, PRETTY GOOD.

I'LL JUST ADD. I LIKE THE SIGN. I THINK IT LOOKS SO NICE. THANK YOU. I WOULD LIKE TO MAKE A MOTION TO APPROVE OUR B 55 2023 WITH THE WAIVERS AS WELL. SECOND INCLUDE THE PROJECT IS JUST ONE SECOND. I'M SO SORRY. I JUST I DID. I DID NOTICE SOMETHING THAT'S EVER HEARD THAT THEY WERE THE REQUEST FOR RELIEF. THE RELIEF B. COULD THAT GET ADDRESSED? THINK UH, OUT OF WAS ABOUT TO DO THAT? YEAH. THE CONDITION OF APPROVAL. OKAY, FANTASTIC. I WOULD LIKE TO MAKE A MOTION TO APPROVE AIR B 55 2023. CERTIFICATE OF APPROPRIATENESS WITH WAIVERS.

NO. I HAVE THE FOLLOWING CONDITION. THE PROJECTING SIGN MUST HAVE AT LEAST ONE INCH IN RELIEF. PERFECT. MR DAVID? YES, MR HENSON? YES? MR BROWN? YES, MISS MORE? YES. I HAVE FOUR

[00:10:04]

VOTES IN FAVOR OF THE APPLICATION. CONGRATULATIONS ON YOUR THANK YOU SO MUCH. MY FAVORITE WORD. GOOD LUCK WITH YOUR BUSINESS. THANK YOU. SHE'LL DO SHE'LL DO GREAT. THANK YOU.

WOMAN KNOWS EVERYTHING ABOUT MEALS AND WHAT'S WRONG AND WHAT PEOPLE ARE DOING THAT INJURY, YOUR NAILS. I MEAN, SHE'S VERY SAINT BUT ABOUT IT. WE'LL SEE YOU SOON. OKAY? YEAH. WHEN DO YOU OPEN? GOOD. TO OKAY? SO SOON, SOMETIMES. OKAY? HAPPENED. SAME HERE. THANK YOU IS THERE.

[VI. Other business]

CHRISTIAN. IS THERE ANY OTHER BUSINESS FOR THE BOARD? NO, THERE'S NONE. AGAIN MY APOLOGIES AND MY APOLOGIES FOR BEING LATE THIS EVENING. HMM. THANK YOU, UM, MOTION TO ADJOURNED. MAKE A MOTION FOR THAT. ALL SECOND. MR BROWN? YES, MR DAVEY? YES YES, MR HENSON. PROPERTY IN FAVOR OF THE MOTION FOR

* This transcript was compiled from uncorrected Closed Captioning.